Install Pneumatic Valve(1) Before the pneumatic valve is installed and used, the pre-installation inspection and switch operation test must be carried out on the valve. It can only be installed and used under the condition of normal operation. (2) The installation of the pneumatic valve should make the valve concentric with the pipeline flange as far as possible, and support and fix it. Do not subject the ball valve to other external forces, so as not to damage the middle seal of the valve and deform the valve. Cause valve switch failure and valve damage and can not be used. (3) It is necessary to ensure that the power air source provided by the balloon valve and pneumatic components must be clean and free from oil and water as much as possible. Cleanliness should be less than 0.4 microns. (4) Before connecting to the air source, the air supply pipeline, air source interface, switch and other components must be cleaned to prevent failures caused by dirt and sand on the pipeline being washed into the pneumatic actuator unit. (5) Copper pipes or nylon pipes can be used for the connection of pneumatic actuators, solenoid valves, positioners, filters, pressure reducing valves, etc. In order to prevent dust and reduce noise, the exhaust port should be equipped with a muffler or a muffler. flow valve. (6) After installation, the pneumatic valve should be tested, pressurize the pneumatic actuator to the rated value, the pressure is 0.4 ~ 0.7mpa, conduct a switch test on the pneumatic ball valve, and observe the opening and closing of the valve. It should rotate flexibly without jamming. If there is jamming in the switch, the air pressure can be increased, and the valve can be adjusted to a flexible switch after repeated switching. |